One of the last trailer loads of scrape to be cut out of the bus.
Having to created a panel to fill in the gap created by cutting and lifting the roof 135mm.
Forming and glassing the nosecone to create custom curves!!
Fibreglass panels on rear now in place
Fibreglass front fitted and glass modifing about to start. Note new fibreglass apron fitted
Side panels trimmed and with the front painted ready for fitting of front mould.
The front screen surounds have been rebuilt and undercoated with epoxy.
The fibreglass back has been repaired and now fitted back on the bus.
Bus muffler is rusty and has been removed to rebuild
New gas cupboard built into the side of the kitchen.
Fibreglass modification underway.
Rear panel sections about to undertake a major revamp.
Front structure modified to take new fibreglass front.
Drivers side windows and door openings are cut out of the 6mm fibreglass.
Passenger side openings cut out.
A week has passed since application, top hats now removed and scaffolding sent back to the hire company.
The top panels have been positioned with top hats screwed on to hold them in place wile the glue takes hold.
A big thank you to the top panel crew who gave up their time at night to help with the lift.