13 August 2019

The ARC Bus
13 August 2019

Scaffolding set on both sides ready for top panels. Cut outs have begun with the wheel wells.

scaffolding and wheels cut.jpeg
The ARC Bus
12 August 2019

The ARC Bus
12 August 2019
tim and micheal scaffolding.jpg
The ARC Bus
12 August 2019

The ARC Bus
12 August 2019

With bottom 2 sides secured, scaffolding was set up in readiness for top sections.

scaffolding set up.jpg
The ARC Bus
11 August 2019

The ARC Bus
11 August 2019

Happy Helpers..very grateful for the extra hands that turned up today

Happy helpers.jpg
The ARC Bus
11 August 2019

The ARC Bus
11 August 2019
sheet construction.jpg
The ARC Bus
11 August 2019

The ARC Bus
11 August 2019

All hands on deck as we install panel 1 of 4!

Bottom sheet fittment.jpg
The ARC Bus
11 August 2019

The ARC Bus
11 August 2019

Sides are prep ready for panels to be applied, and insulation is put in place.

Insulation fittment.jpg
The ARC Bus
11 August 2019

The ARC Bus
11 August 2019

All four sheets in shed ready for application.

Panels in shed.jpg
The ARC Bus
4 August 2019

The ARC Bus
4 August 2019

It was all hands on deck to carry the 12.5metre long 1.8metre wide sheets weighing 120kg.

John from FRP and gang.jpg
The ARC Bus
4 August 2019

The ARC Bus
4 August 2019

A big thankyou to John from FRP who delivered our 4 panels full length after hours on his truck.

Panel Truck.jpg
The ARC Bus
18 July 2019

The ARC Bus
18 July 2019

More sandblasting and prep work completed. Notice the upstairs side construction complete ready for panels, and the round window frames!

20190714_125847.jpg
The ARC Bus
18 July 2019

The ARC Bus
18 July 2019

All lower areas that were rusty including wheel archers have been sandblasted and prep.

20190714_130348.jpg
The ARC Bus
16 June 2019

The ARC Bus
16 June 2019

Lots of help from dedicated people.

20190708_213454.jpg
The ARC Bus
16 June 2019

The ARC Bus
16 June 2019

Downstairs taking shape.

15625436268711388515474814436712.jpg
The ARC Bus
16 June 2019

The ARC Bus
16 June 2019

Front of bus ready to be removed, headlights also being removed replaced with modern round LEDs.

15625437216227711800948370819169.jpg
The ARC Bus
16 June 2019

The ARC Bus
16 June 2019

Fabrication begins on the upper level.

15625437856572078684566340492394.jpg
The ARC Bus
9 June 2019

The ARC Bus
9 June 2019

Always precise

15625439614227584310851846584232.jpg
The ARC Bus
19 May 2019

The ARC Bus
19 May 2019

The drivers bunk step has been removed to make way for more recording studio floor space. New floor structure is being placed along with the studios wall.

20190526_192511.jpg
The ARC Bus
12 May 2019

The ARC Bus
12 May 2019

The gap has been filled in caused by the lift. The huge electrical board that controlled airconditioning has been removed.

àbackkk.jpg
The ARC Bus
5 May 2019

The ARC Bus
5 May 2019

The old escape hatches are removed to be replaced with new ones.

20190512_193107.jpg