New kicten floor now being placed.
All uprights now replaced having twice the structual strength from new.
Stairs taking shape.
Atop view of our stair treds in place.
New top level uprights replacing the cut ones.
As the new longer uprights are slowly welded in, the lift can be seen by the 130mm gap in the rear panel.
After all the up rights were cut including the front and rear panels, the acrow props were wound up in sequence to achieve our 130mm lift of the roof. New structual uprights then started to be placed.
Gap shown on front corner after the roof lift.
WIth the 8 acrow props being held by Sally, Tim, Nigel and soon to be Joe, he took to the uprights with a nine inch grinder
Tim helps to place the acrow props in place in ready to lift the roof. Notice uder his feet the new floor sheeting where the stairs once were.
Where the stairs once were a fabricated bench starts to take shape in the kitchen covering the fuel tank.
Stairs being fabricated.
The stairs fabricated in their new home up behind the driver, where the hole has been cut in the second storey.
One large hole gets cut in the second storey to make way for a new set of stairs
A huge thankyou to the guys from Central Engineering for the donation of our structual steel.
New floor and structual strength is added to where the spare tyre well, and toilet once were.